Above-joist systems during construction
An above-joist system is coordinated with the frame before the walking boards cover it. Product details govern collection, slope, penetrations and how water reaches the outlet. Trex RainEscape is one example whose existing-deck installation requires removing boards. This stage can align with a new deck or suitable redecking, but compatibility still needs review. The proposed scope should identify the actual product and any surface removal, rather than describing every installation as a simple addition beneath an unchanged deck.


